Architectural Review Committee
Architectural Review Committee (ARC) is established to preserve the harmonious design of the community.
Committee members are charged with maintaining a semblance of uniformity and balance within the neighborhood. Their efforts protect the value of the properties within the community.
Owners must submit an Architectural Committee Review request before any exterior changes, additions, or deletions are made to a property within Barrington of Rockledge. These changes include, but are not limited to, the following:
- Paint – the brand, code, and color must be provided, along with a sample of paint, for painting done to any external area of homes.
- Landscape – submit detailed drawings/sketches, permits, and description of item(s) being planted or removed. Grass/sod must be approved only if the entire yard is re-sodded.
- Lighting – details regarding the materials and location of external lighting should be included in the ARC request.
- Structure – requests for new or changes to structural elements such as pools, patios, privacy walls and other exterior structures should be fully documented and submitted for review.
- Architectural – fences, roofing, trim work, shutters, and other architectural changes, additions, or deletions require ARC approval.
- Design items – changes to existing windows, doors, siding and other design elements must be reviewed before installation.
Please provide clear, concise information regarding your request. The committee will need a full understanding of the changes, additions, etc. that you are trying to make.
When in doubt, complete an ARC Form for review. It is better to submit a request that may not be required than to perform work that fails to comply with the Association’s documents. Should this occur, you may be required to return the property to its original state.
The ARC Committee meets each month. ARC submissions should be mailed to the HOA mailing address for review. Submissions will be reviewed at the next monthly meeting. Homeowners will be notified of additional items needed to complete the submission and/or the committee’s decision following the monthly meeting.
ARC Request Forms must be received by the Friday before each meeting to be included on the agenda.
Should you have any questions, please email: ARC@barringtonofrockledge.com
ARC Documents
ARC Manual (1 of 3)
ARC Manual (2 of 3)
ARC Manual (3 of 3)
Fence_Guidelines_2001
ARC Rule 2016 — Privacy Screen
ARC Rule 2016-1 — ARC Committee Meetings
Helpful Links: City of Rockledge